Highway Report
Washington Labor Day Weekend Road Recap
What Washington's department of transportation (DOT) feed showed from Thursday, Sept. 3 through Labor Day, Monday, Sept. 7, 2026. Part of the national Labor Day Weekend Road Recap.
Crashes
8 crashes were reported in Washington from Sept. 3 through Sept. 7.
- I-5 — 5
- US-101 — 1
- US-12 — 1
Closures and roadwork
4 closures and 186 roadwork records were on Washington's feed over the five days.
- I-5 — 13
- I-90 — 6
- I-405 — 6
- SR-9 — 3
- SR-99 — 2
The longest scheduled project on the feed is SR-165, 1,902 days, April 16, 2025 through July 1, 2030. The posted description reads “SR 165 is closed at the Carbon River/Fairfax Bridge to all vehicles, bicyclists and pedestrians until further notice. The closure means there is no access across the bridge to Mount Rainier National Park Mowich Lake⦔
Border waits
Longest passenger-lane waits at Washington's crossings, Sept. 3 through Sept. 7, with the five-day average.
- Blaine / Peace Arch — 50 min, Sunday at 9 PM; average 9 min
- Blaine / Pacific Highway — 45 min, Saturday at 12 PM; average 8 min
- Lynden — 40 min, Saturday at 10 AM; average 5 min
- Sumas — 30 min, Thursday at 11 AM; average 2 min
Blaine's Peace Arch crossing averaged 9 minutes over the five days. On Labor Day the slowest hour there was 1 PM and the fastest was 5 PM.
Live waits for all 85 crossings are at milecheckapp.com/borders.
Seattle drawbridges
Seattle's five drawbridges opened 213 times from Thursday through Monday.
- fremont — 86 openings, typically 4 minutes, longest 10
- ballard — 73 openings, typically 4 minutes, longest 8
- montlake — 41 openings, typically 6 minutes, longest 10
- 1st ave s — 8 openings, typically 10 minutes, longest 20
- south park — 5 openings, typically 6 minutes, longest 6
Live status for all five is on the drawbridge map.
Wildfires
As of Labor Day, Washington had 48 active fires covering 652,207 acres.
- Little Giant (Chelan County), 171,163 acres, 81% contained
- Sinlahekin (Okanogan County), 166,116 acres, 59% contained
- Kaiser Canyon (Okanogan County), 138,293 acres, 100% contained
- Modrite (Ferry County), 57,594 acres, 100% contained
Live fire perimeters and the closures near them are at milecheckapp.com/fire.
See the national recap or another state: all 50 states and British Columbia.
The live version is in the app.
MileCheck shows DOT alerts for crashes, closures, and delays in all 50 states and British Columbia as they are published, with your nearest mile marker.
App Store Google PlayBuilt from MileCheck's archive of state DOT road feeds. The monthly Highway Report, the same treatment across a full month, starts with September 2026.