Highway Report
Texas Labor Day Weekend Road Recap
What Texas's department of transportation (DOT) feed showed from Thursday, Sept. 3 through Labor Day, Monday, Sept. 7, 2026. Part of the national Labor Day Weekend Road Recap.
Crashes
3 crashes were reported in Texas from Sept. 3 through Sept. 7.
- TX-46 — 1
- I-10 — 1
- TX-LOOP-375 — 1
Closures and roadwork
6 closures and 423 roadwork records were on Texas's feed over the five days.
- I-35 — 46
- I-10 — 26
- I-30 — 26
- I-20 — 16
- US-75 — 12
The longest scheduled project on the feed is US-87, 2,070 days, March 2, 2026 through October 31, 2031. The posted description reads “Alternating lanes closed. New construction for divided hwy, improve existing roadway, drainage wor”
Border waits
Longest passenger-lane waits at Texas's crossings, Sept. 3 through Sept. 7, with the five-day average.
- Del Rio — 180 min, Monday at 6 PM; average 33 min
- Brownsville / B&M — 150 min, Monday at 6 PM; average 23 min
- Eagle Pass / Bridge II — 150 min, Monday at 5 PM; average 30 min
- Brownsville / Gateway — 120 min, Monday at 4 PM; average 29 min
- Brownsville / Los Indios — 120 min, Monday at 4 PM; average 17 min
- Brownsville / Veterans International — 90 min, Monday at 4 PM; average 22 min
Live waits for all 85 crossings are at milecheckapp.com/borders.
Wildfires
As of Labor Day, Texas had 4 active fires covering 90,948 acres.
- Ross (Palo Pinto County), 90,400 acres, 57% contained
- Red Gate (Schleicher County), 466 acres, 70% contained
- South Day (Sutton County), 77 acres, 95% contained
- Gregg 8192 (Gregg County), 5 acres, 50% contained
Live fire perimeters and the closures near them are at milecheckapp.com/fire.
See the national recap or another state: all 50 states and British Columbia.
The live version is in the app.
MileCheck shows DOT alerts for crashes, closures, and delays in all 50 states and British Columbia as they are published, with your nearest mile marker.
App Store Google PlayBuilt from MileCheck's archive of state DOT road feeds. The monthly Highway Report, the same treatment across a full month, starts with September 2026.